KHOR AL ZUBAIR PLANT

This plant is located on 15,000 m2 of land owned by AUC and has one 120m3/h concrete plant, two workshops, a laboratory and other associated facilities. The scope of services performed at this plant are mainly associated with supplying projects with pre-mix concrete, and fabricating double-T roofing, supporters and piles . The total manpower at this plant is 220, including engineers, drivers, administrative staff, laborers, etc.

NEW BASRA INDUSTRIAL ZONE

This plant is located on 30,000 m2 of land. The plant has one 120m3/h stationary batch plant, two 60 m3/h mobile plants, and one gravel crusher. This plant produces precast concrete products such as inverted T-walls, barriers, bunkers, piles, and pipe supporters. There are 50 personnel working at this plant

NORTH RUMAILA PLANT

This plant is located on 5,000 m2 of land. The plant has one 120m3/h stationary batch plant. This plant produces premix concrete for the majority of North Rumaila projects. There are 40 personnel working at this plant

AL HAYDARIA (NAJAF) PLANT

This plant is located on 5,000 m2 of land. The plant has one 120m3/h stationary batch plant. This plant produces premix concrete for the majority of Najaf projects. There are 40 personnel working at this plant

BASRA CITY CENTER PLANT

This plant is located on 5,000 m2 of land. The plant has one 120m3/h stationary batch plant. This plant produces premix concrete for the majority of Basra projects. There are 40 personnel working at this plant

SOUTH RUMAILA PLANT 1

This plant is located on 5,000 m2 of land and is one of two plants located in South Rumaila. The plant has one 120m3/h stationary batch plant. This plant produces premix concrete for some of the of South Rumaila projects. There are 40 personnel working at this plant

SOUTH RUMAILA PLANT 2

This plant is located on 5,000 m2 of land and is the second of two plants located in South Rumaila. The plant has one 120m3/h stationary batch plant. This plant produces premix concrete for the remainder of the South Rumaila projects. There are 40 personnel working at this plant

GRAVEL PLANT

AUC has its own gravel plant which supplies all of its concrete plants. This ensures a reliable supply of this crucial material for AUC’s concrete products production. The AUC gravel plant is located in Buttain on the south side of Basra City. Buttain is well-known as a source of high quality sand and gravel. This plant has four gravel crushers, which produce a total of 3,000 m3 of gravel per day.